| Project Atlas | Prairie North (fictional) | Prairie Crest Electric (fictional) | 400 MW | 400 MW | 0 MW | Dec 31, 2029 | Sep 30, 2030 | Late+273 days | Engineering / ProcurementRemaining full-capacity pathway | 400 MWStudied | $98MIllustrative study / facilities forecast | Route approval now controls full-capacity deliveryConstructability · Open | Critical | Engineering and long-lead procurement gateForecast Apr 3, 2030 | Choose the route-recovery study path | Oct 8, 2026Upcoming | Avery Lin (fictional) |
|---|
| Project Orion | Riverbend East (fictional) | Riverbend Grid Services (fictional) | 500 MW | 200 MW | 200 MW | Jun 30, 2030 | Jun 30, 2031 | Late+365 days | Upgrade DefinitionRemaining full-capacity pathway | Mixed200 MWContracted300 MWStudied | $115MIllustrative study / facilities forecast | Fictional contingency study identifies a transmission-path thermal overload above the supported interim 200 MW; an upgrade is required for the additional 300 MW.Thermal / N-1 · Open | Critical | Upgrade scope definedForecast Oct 24, 2027 | Authorize next-stage facilities engineering | Oct 15, 2026Upcoming | Morgan Vale (fictional) |
|---|
| Project Summit | Highland Basin (fictional) | Highland Basin Power (fictional) | 400 MW | 200 MW | 200 MW | Jun 30, 2030 | Jun 30, 2030 | At target0 days | Commercial NegotiationRemaining full-capacity pathway | Mixed200 MWContracted200 MWStudied | $100MIllustrative study / facilities forecast | Revised facilities estimate exceeds the current illustrative budgetSubstation / transformer capacity · Open | High | Commercial positions agreedForecast Nov 1, 2027 | Select the facilities scope and commercial negotiation position | Oct 12, 2026Upcoming | Casey Rowan (fictional) |
|---|
| Project Nova | Lakeshore South (fictional) | Lakeshore Utility Cooperative (fictional) | 300 MW | 150 MW | 0 MW | Dec 31, 2029 | Dec 31, 2029 | At target0 days | Commercial NegotiationRemaining full-capacity pathway | Mixed150 MWStudied150 MWPreliminary | $62MIllustrative study / facilities forecast | Security deadline arrives before the preferred service terms are settledCommercial conditions · Open | Critical | Commercial positions agreedForecast Sep 2, 2027 | Choose the security and ESA negotiation path | Oct 3, 2026Upcoming | Jordan Ellis (fictional) |
|---|
| Project Horizon | Mesa View (fictional) | Mesa View Electric (fictional) | 500 MW | 500 MW | 0 MW | Dec 31, 2030 | Unknown | Unknown | ScreeningRemaining full-capacity pathway | 500 MWScreening | UnknownEstimate not established — excluded from known subtotal | Screening information does not establish a utility delivery pathNot yet assessed · Open | Moderate | Screening review completePlanned Mar 2, 2027 · forecast unknown | No open decision recorded | Not applicable | Taylor Quinn (fictional) |
|---|
| Project Cedar | Cedar Plain (fictional) | Cedar Plain Transmission and Service (fictional) | 350 MW | 350 MW | 0 MW | Jun 30, 2030 | Unknown | Unknown | StudyRemaining full-capacity pathway | 350 MWPreliminary | $25MPreliminary allowance | Unreviewed study assumptions may alter the available MW or upgrade scopeStudy results pending · Open | Moderate | Study review completePlanned May 27, 2027 · forecast unknown | No open decision recorded | Not applicable | Riley Brooks (fictional) |
|---|
| Project Vector | Foothill Crossing (fictional) | Foothill Crossing Electric (fictional) | 250 MW | 250 MW | 0 MW | Dec 31, 2029 | Mar 31, 2030 | Late+90 days | Upgrade DefinitionRemaining full-capacity pathway | 250 MWStudied | $70MIllustrative study / facilities forecast | Fictional study reports inadequate post-contingency voltage performance at the proposed 250 MW load without additional reactive support or a revised topology.Voltage / reactive performance · Open | High | Upgrade scope definedForecast Jul 2, 2027 | Select which voltage-mitigation option to advance | Oct 22, 2026Later | Samir Lake (fictional) |
|---|
| Project Keystone | Keystone Valley (fictional) | Keystone Valley Utility (fictional) | 300 MW | 300 MW | 300 MW | Mar 31, 2028 | Mar 31, 2028 | At target0 days | ConstructionRemaining full-capacity pathway | 300 MWUnder Construction | $88MIllustrative study / facilities forecast | Construction interfaces require coordinated outage and access windowsConstruction sequencing · Open | Moderate | Construction completeForecast Jan 1, 2028 | No open decision recorded | Not applicable | Drew Mercer (fictional) |
|---|
| Project Aurora | Aurora Reach (fictional) | Aurora Reach Power (fictional) | 150 MW | 150 MW | 150 MW | Dec 15, 2026 | Dec 15, 2026 | At target0 days | CommissioningRemaining full-capacity pathway | 150 MWUnder Construction | $42MIllustrative study / facilities forecast | Final protection and commissioning evidence must be acceptedCommissioning / protection readiness · Open | Moderate | Commissioning acceptanceForecast Dec 1, 2026 | No open decision recorded | Not applicable | Alex Arden (fictional) |
|---|
| Project Meridian | Meridian Park (fictional) | Meridian Park Electric (fictional) | 250 MW | 250 MW | 250 MW | Jun 30, 2029 | Jun 30, 2029 | At target0 days | Engineering / ProcurementRemaining full-capacity pathway | 250 MWContracted | $32MIllustrative study / facilities forecast | Route access issue resolved in the fictional recordAccess condition resolved · Resolved | Low | Engineering and long-lead procurement gateForecast Jan 1, 2029 | No open decision recorded | Not applicable | Jamie Finch (fictional) |
|---|